Limited-Time Offer Fall Special: $1,000 Off Kitchen Remodels · $500 Off Tub-to-Walk-In Shower Conversions Ends 2026-11-30
View Offer
Houston, The Woodlands, Conroe, Kingwood and the Lake Livingston area

Bathroom Remodeling
Contractor in Houston, TX

From a dated tub-and-tile bathroom to a finished space with a walk-in shower, new vanity, waterproofed walls and floor tile that stays put in Houston humidity. One crew, one written contract, one price.

What a bathroom remodel includes

Every bathroom is different, but the scope usually covers these pieces. You choose how far to go; we write it down before anyone picks up a tool.

Demolition and protection

Old tub, tile, vanity and flooring come out. Floors and hallways outside the bathroom are covered, and debris leaves the house the same day.

Walk-in shower or new tub

Custom tiled walk-in showers with a built shower pan, curb or curbless entry, niche and glass. Or a new tub with a tiled surround if that fits the home better.

Waterproofing behind the tile

Cement board, liquid or sheet membrane on the walls and floor of the shower, and a 24-hour flood test on the pan before any tile goes on.

Tile work

Floor and wall tile in porcelain, ceramic, natural stone or large format. Layouts include subway, herringbone, stacked and mosaic accents.

Vanity, fixtures and lighting

Vanity and countertop installation, faucet and shower trim, toilet, mirror, and the finish work around them so everything sits level and sealed.

Paint, trim and cleanup

Drywall repair where the old tile came off, fresh paint, baseboard and door trim, and a full cleanup so the bathroom is ready to use the day we finish.

A bathroom we finished recently

Freestanding tub, tiled walk-in shower with frameless glass, hexagon mosaic shower floor and large-format porcelain walls. Photographed on site before the final clean.

Materials and design choices

The price of a bathroom remodel in Houston moves mostly with these decisions. We walk through them at the estimate so the proposal reflects what you actually want.

Shower style

Tiled walk-in with a low curb is the most requested. Curbless entries suit accessibility needs. Prefabricated acrylic units are the budget option and install faster.

Tile type and size

Porcelain handles moisture best and comes in large formats that mean fewer grout lines. Natural stone looks richer but needs sealing. Small mosaics work for shower floors and accents.

Vanity and counter

Ready-made vanities keep costs down. Custom or semi-custom cabinets with quartz tops give more storage and a cleaner look in larger bathrooms.

Glass and hardware

Frameless glass panels, matte black or brushed nickel fixtures, and niche placement are small choices that change how finished the room feels.

Small bathroom remodels

Hall bathrooms, guest baths and powder rooms: small rooms where every inch and every decision counts.

Tub to walk-in shower in the same alcove

The old tub comes out and a tiled walk-in shower goes in its place, with a built pan, waterproofing and a 24-hour flood test. No walls need to move.

Space-saving storage

Built-in shower niches, a vanity sized to the room and wall storage keep counters clear without making the room feel crowded.

Tile that makes the room feel bigger

Large-format porcelain with fewer grout lines and lighter colors visually open a small bathroom.

A short schedule

Small bathrooms are usually back in service fast, and the dates are written in the contract before demolition.

Luxury primary bathroom remodels

For primary bathrooms in The Woodlands, Spring, Kingwood and Houston, where finishes and waterproofing have to last. In The Woodlands and Spring we have completed full bathrooms with freestanding tubs and glass showers.

Freestanding tubs

A freestanding tub as the centerpiece, with the floor and plumbing prepared for it.

Frameless glass walk-in showers

Large showers with frameless glass, built-in niches and benches, flood-tested for 24 hours before the tile goes on.

Stone and large-format tile

Marble-look porcelain, natural stone and large-format tile on walls and floors, set with level layouts and clean grout lines.

Double vanities with quartz tops

Double vanities with quartz or marble tops, undermount sinks and lighting that makes the room feel finished.

How a bathroom remodel goes

Most hall bathrooms take two to three weeks from demolition to final walkthrough. Master bathrooms with layout changes take longer, and the schedule is part of the contract.

In-home estimate

We measure the room, look at the existing plumbing and framing, and talk through what you want to change. No charge, no obligation.

Written proposal

You receive a line-by-line scope with a fixed price, the payment schedule and the timeline. Selections like tile and vanity are confirmed before we order.

Demolition and prep

The old bathroom comes out, framing is checked and repaired where needed, and the shower area is built and waterproofed.

Flood test and tile

The shower pan sits full of water for 24 hours. Only after it passes do we set floor and wall tile.

Fixtures and finish

Vanity, toilet, glass, mirror, lighting, trim and paint go in. We walk the room with you and correct anything before the final payment.

Why Houston homeowners choose Earlimon for bathrooms

A bathroom is the room where hidden mistakes cost the most. Water behind tile does not show up for a year. This is how we work so it never does.

  • Written contract on every project. Scope, price, payment schedule and timeline are signed before work starts. No verbal add-ons.
  • Flood test before tile, always. Every shower pan is tested for 24 hours. If it does not hold water, it gets rebuilt at our cost.
  • The same crew from start to finish. George is on site and you have his direct number. Questions are answered the same day.
  • Clean house while we work. Floors are covered from the front door to the bathroom and the site is swept every evening.
  • Estimates that hold. The price in the proposal is the price you pay unless you change the scope, and any change is written and priced before it happens.

Questions homeowners ask

How much does a bathroom remodel cost in Houston?
The price depends on the size of the bathroom, whether the layout changes, and the tile, vanity, fixtures and glass you choose. After a free in-home estimate you receive a fixed written price for your specific room, and that is the price you pay unless you change the scope.
How long does a bathroom remodel take?
Two to three weeks for a typical hall bathroom once materials are on site. Larger master bathrooms or projects that move plumbing take three to five weeks. The timeline is written into the contract.
Can I keep using the bathroom during the remodel?
Not the one being remodeled. Once demolition starts it is out of service until the final day. We schedule so the downtime is as short as possible and let you know before each stage.
Do you handle the plumbing and electrical?
We coordinate the full project and bring in licensed trades for the plumbing and electrical portions that require them. You deal with one contract and one point of contact.
What areas do you serve for bathroom remodeling?
Houston and the north and northeast suburbs including The Woodlands, Conroe, Spring, Humble and Kingwood, plus the Lake Livingston area: Livingston, Onalaska, Coldspring, Oakhurst, Huntsville, Willis, Cleveland, New Caney, Porter, Splendora, Shepherd, Point Blank, New Waverly and Trinity.
Do you offer financing or payment plans?
Projects are paid in stages: a deposit to start, a progress payment mid-project, and the balance at the final walkthrough. The exact schedule is in the proposal. We accept cash, check, Zelle and Venmo with prior approval.
How We Work

What you can count on before anything starts.

  • A written contract before work begins

    Final pricing is confirmed in a written service agreement after an on-site assessment. No work starts until you have reviewed and signed it.

  • Same-day response

    Requests that reach us during business hours get an answer the same day. Mon-Fri 8AM-6PM · Sat 8AM-4PM.

  • Payment in three stages

    Deposit before the project starts, a progress payment at the milestone defined in your contract, and the balance on completion and your acceptance of the work.

  • On-time completion credit

    A plus written into your contract: if we miss the agreed completion date for reasons within our control, you receive the credit stated there. Delays caused by changes, late selections, access, payments, weather, permits, hidden conditions, or by stores, suppliers and other third parties outside our company do not count.

Full terms are in our Terms of Service and in the agreement you sign.

Ready to plan your bathroom remodel?

Send a few photos and the size of the room, or book the free in-home estimate. You get a written proposal with a fixed price and a start date.

Tell us about your bathroom

Share the room, the scope and what matters most to you. You will hear back the same business day.